MARKETING

Page Under Construction

The loading point concept is being used to capture the unit number from where the dispatch is being made. This is required because the UNIT III has a tax exemption. Also the PLA report is unitwise. Now only plant code 1901 has this unit number concept. Therefore only the shipping points assigned to this plant have loading points.